The reception area for the new Headquarter of the BOA has a long curved wall which acts as a room divider. The dominant 5 bands which flow with the length of the wall are truncated at doorways to reveal the 5 Olympic colours on their return faces. Integrated along the length of the wall are 13 glass display boxes each containing an Olympic Torch from different Games dating back to the infamous Berlin Olympics of 1936.
The entire wall was pre-fabricated in our factory to enable the complete site fit to be completed in 3 weeks.
- Items
-
Audio visual walls
Reception desks
- Sector
- Public
- End user
- British Olympic Association
- Location
- Central London
- Main contractor
- Modus Interiors
- Architect
- Gebler Tooth
- Program
- 8 weeks